Every other page on this site answers "what is it worth today." This one answers a harder question: will it work at all? A TEV study tests whether a project is technically sound and financially self-sustaining before a lender commits real money to it — and since October 2025, it's a legal requirement above a specific exposure threshold, not just good banking practice.
Type a city name to jump straight to local coverage.
Showing all cities currently served.
Projects rarely earn full revenue from day one of operations. A TEV study has to model the ramp-up, not just the eventual steady state.
Illustrative shape only — not a projection for any real project. Actual ramp-up depends on sector, offtake contracts, and commissioning risk.
An independent assessment of whether a proposed project is both technically achievable and financially self-sustaining — covering the technology or process chosen, the promoter's capability to execute it, realistic demand and revenue assumptions, and whether the resulting cash flows can actually service the debt being proposed. It's the diligence a lender does before committing, not after.
Under RBI's current framework, a project qualifies as "project finance" when at least 51% of debt servicing is expected to come from the project's own cash flows, and all lenders sign a common loan agreement — that definition is what pulls a project into TEV territory in the first place.
RBI (Project Finance) Directions, 2025 mandate a TEV study wherever aggregate lender exposure to a project reaches ₹100 crore or more — at sanction, and again if the DCCO or appointed date is later revised, since that revision requires a fresh viability assessment before lenders can agree a supplementary disbursement arrangement. Below ₹100 crore, individual lender policy governs, but most credit committees still expect one for anything genuinely complex.
Commercial Operations Date (COD) is the term used in power-purchase agreements and concession contracts for when a project actually starts operating. DCCO is RBI's own regulatory anchor — drawn from the same milestone — used specifically to determine provisioning and income-recognition treatment on the lending side. A TEV study and its later COD certification feed directly into whether an account stays classified as standard.
For exposures up to ₹1,500 crore, each lender in a consortium must hold at least 10% of total debt; above that, the floor is ₹150 crore or 5%, whichever is higher. A shared, credible TEV study is what lets a consortium actually rely on one another's underwriting instead of duplicating it.
Utility-scale solar typically needs roughly 4–5 acres per MW; wind needs a larger spread for turbine spacing but a smaller actual footprint, often allowing continued agricultural use around towers. Transmission right-of-way compensation is governed by the Indian Telegraph Act, the Electricity Act, 2003, and technical standard IS 5613 — and Ministry of Power land-compensation guidelines only apply to lines built after October 2015, which matters when a project's evacuation infrastructure predates that cutoff.
Mandatory once aggregate lender exposure reaches ₹100 crore.
A fresh TEV is required before lenders can agree the supplementary arrangement.
Assessing land, lease terms, and evacuation right-of-way before financial closure.
Independent traffic or usage projections behind a concession's revenue case.
Investor or acquirer diligence on a project's technical and commercial soundness, outside a lending context.
Confirming the milestone that shifts a project from construction-phase to operating-phase treatment.
| Lender's Independent Engineer | The project is already sanctioned and you need ongoing disbursement monitoring, not the upfront study. |
| Property Valuation | You need a value opinion on existing land or a building, not a feasibility assessment of a proposed project. |
| Company Act Valuation | The question is what an existing business is worth, not whether a new project will work. |
| TEV | Techno-Economic Viability — a combined technical and financial feasibility assessment. |
| DSCR | Debt Service Coverage Ratio — project cash flow available divided by debt obligations due, a core lender metric. |
| IRR | Internal Rate of Return — the discount rate at which a project's projected cash flows break even against its cost. |
| COD | Commercial Operations Date — when a project actually begins operating, per its PPA or concession agreement. |
| DCCO | RBI's regulatory version of the same milestone, used for provisioning and income-recognition purposes. |
| Right-of-way (RoW) | Legal access across land needed for transmission lines or pipelines, separate from owning the land itself. |
| Appointed date | In PPP projects, the formal start date before which fund-based disbursement isn't permitted. |
| Credit event | The broadened trigger under RBI's 2025 Directions that requires lenders to begin collective resolution. |
An independent assessment of whether a proposed project is technically achievable and financially self-sustaining, done before a lender commits funds.
Under RBI's Project Finance Directions, 2025, wherever aggregate lender exposure to a project reaches ₹100 crore or more.
Yes, if the DCCO or appointed date is revised on a project at or above the ₹100 crore threshold, a fresh study is required before lenders can agree the change.
Utility-scale solar typically needs roughly 4–5 acres per MW; wind needs more spread for spacing but a smaller physical footprint, often allowing dual land use.
The TEV study is the upfront feasibility assessment before sanction; the LIE then monitors the project's actual progress against that assessment through construction.
Tell us the purpose and roughly what you're having valued. We'll confirm the right format before booking anything. General information only - not tax or legal advice.
Every city below has a dedicated Techno-Economic Viability (TEV) Service page — type to filter, or browse by state.
No matching city — try a different spelling, or browse the full city list.